Loading...
24417 STARGAZER WAY FIRE21-0873 SAVANNAHIliana Gutierrez Subject: FIRE21-0873 TR36485 SPK FINAL LOT 10 Location: 24417 STARGAZER WAY Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Tue 10/19/2021 8:00 AM Tue 10/19/2021 8:30 AM (none) Menifee OFM 2 Cell#: Co. Name: FSS k..rUbbOL. OMWANN/An HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct de!rs/velocit Flush 24 hr..eatte test Final S rfnkler monitoring SPRINKLER U.G. orinal Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro % Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER f Deluge/pre-action Weld inspection r a1 Overhead rough piping 1C%6,W UST/AST TANK Overhead hydro nstallation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOWEXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 3 Iliana Gutierrez Subject: FIRE21-0873 TR36485 O/H ROUGH/HYDRO LOT 10 Location: 24417 STARGAZER WAY Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Wed 8/4/2021 12:30 PM Wed 8/4/2021 1:00 PM (none) Menifee OFM 2 Cell#: Co. Name: FSS CrossSt: SAVANNAH HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X i Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Seconds piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 11