Loading...
24416 STARGAZER WAY FIRE21-0876 SAVANNAHIliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-0876 TR36485 SPK FINAL LOT 91 24416 STARGAZER WAY Tue 10/19/2021 8:30 AM Tue 10/19/2021 9:00 AM (none) Menifee OFM 2 Cell#: Co. Name FSS %.AUbbOL. 0MvrUN11y r1 HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Ro h-wire inspection Underground rough oKnction test Under round hydro Duct detectors/velocit Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Under round hydro 4r& Abort test Flush PMechanical shutdown Final ► Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect NP Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks ZDispensers & shear valves X Final Final KITCHEN HOOD ]-TINGUISHING MISC. INSPECTION Detection systeV Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation BuildingKnox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 7 (liana Gutierrez Subject: FIRE21-0876 TR36485 O/H ROUGH/HYDRO LOT 91 Location: 24416 STARGAZER WAY Start: Wed 8/4/2021 1:30 PM End: Wed 8/4/2021 2:00 PM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS CrossSt: SAVANNAH HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battepf test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Delu a/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupanc Start Time: Finish Time: Start Time: Finish Time: 19