24414 FAIR OAKS CT FIRE21-1202 JASPERJohnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
FIRE21-1202 TR36485-6/9 FINAL LOT 48
24414 FAIR OAKS CT
Tue 11/16/2021 9:00 AM
Tue 11/16/2021 9:30 AM
(none)
Meeting organizer
Johnathan Baker
2
Cel I#:
Co. Name:
FSS
L�L�b�r1�1G[►] r y IL1
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rou h-wiry inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocit
Flush
24 hr. batte test
Final
Spri ler monitoring
SPRINKLER U.G.
Fin I
Thrust block pre -pour
` - ' SPECIAL SUPPRESSION
Underground rough
\
boor fan test
Underground hydro
\
(Abort test
Flush
J
Mechanical shutdown
Final
\
Detector test
FIRE SPRINKLER
\
Deluge/pre-action
Weld inspection
\ 1 /
Final
Overhead rough piping
\ /
UST/AST TANK
Overhead hydro
/
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
I
Spray booths
Function Test
/
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
v
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/Dadlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Steven Fox
Subject: FIRE21-1202 TR36485 O/H ROUGH/HYDRO LOT 48
Location: 24414 FAIR OAKS CT
Start: Wed 9/15/2021 3:30 PM
End: Wed 9/15/2021 4:00 PM
Recurrence: (none)
Organizer: Steven Fox
Call Handling Mode 2: 2
Rep. Name: HECTOR
Phone#: 951-847-2908
Cell#:
Co. Name: FSS
CrossSt: JASPER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping_
jt_
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
Start Time: Finish Time:
21