24374 FAIR OAKS CT FIRE21-1197 JASPERJohnathan Baker
Subject: FIRE21-1197 TR36485-6/9 FINAL LOT 43
Location: 24374 FAIR OAKS CT
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
Tue 11/16/2021 8:00 AM
Tue 11/16/2021 8:30 AM
(none)
Meeting organizer
Johnathan Baker
2
Co. Name: FSS
Cell#: CrossSt: JASPER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test/
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Poor farytest
Underground hydro
t
/Abort J6st
Flush
\
Mecfanical shutdown
Final
Dotector test
FIRE SPRINKLER
Oelu e/pre-action
Weld inspection
'\
Final
Overhead rough piping
1
/
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
/
Primary piping
In -rack sprinklers
/
Secondary piping
Hose racks
\
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
{
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
1
Tract access/hydrant verification
Final
i
Other:
SPRAY BOOTHS /
KNOX SYSTEM
Installation /
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
91
Steven Fox
Subject: FIRE21-1197 TR36485 O/H ROUGH/HYDRO LOT 43
Location: 24374 FAIR OAKS CT
Start: Wed 9/15/2021 2:30 PM
End: Wed 9/15/2021 3:00 PM
Recurrence: (none)
Organizer: Steven Fox
Call Handling Mode 2: 2
Rep. Name: HECTOR
Phone#: 951-847-2908
Cell#:
Co. Name: FSS
in 102:'2-.1011 IAVW]r-1.I
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
'u
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time.
Finish Time:
15