Loading...
24350 FAIR OAKS CT FIRE21-1097 JASPER(liana Gutierrez Subject: FIRE21-1097 TR36485 SPK FINAL LOT 40 Location: 24350 FAIR OAKS CT Start: End: Recurrence: Organizer: Call Handling Mode 2 Rep. Name: HECTOR Phone#: 951-847-2908 Wed 11/3/2021 12:30 PM Wed 11/3/2021 1:00 PM (none) Menifee OFM 2 Cell#: Co. Name: FSS UlubbAl: J/A0rr-M HYDRANT SYSTEM PASS FAIL A FIRE ALARM PASS FAIL Thrust block pre -pour I Ro -wire inspection Under round rough I F ction test Underground hydro uct detectors/velocity Flush A 24 hr. batte test Final / Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour Y, SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro f' A test Flush "' h I shutdown Final test FIRE SPRINKLER a/pre-action Weld inspection 4— iI Overhead rough piping ' UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 11 (liana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 FIRE21-1097 TR36485 O/H ROUGH/HYDRO LOT 40 24350 FAIR OAKS CT Wed 8/18/2021 9:00 AM Wed 8/18/2021 9:30 AM (none) Menifee OFM 2 Cell#: Co. Name FSS kAUbbOL. arW)rrZr_% HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final I Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X I Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 5