31103 ALCOVE LN FIRE21-0667 MEADOW RUN(liana Gutierrez
Subject: FIRE21-0667 TR37576 SPK FINAL LOT 60
Location: 31103 ALCOVE LN
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: DANIEL
Phone#: 951-703-5210
Wed 9/1/2021 9:00 AM
Wed 9/1/2021 9:30 AM
(none)
Menifee OFM
2
Cell#:
Co. Name: NP MECHANICAL
CrossSt: MEADOW RUN
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rou h-wire inspection
Under round rough
Furj6ion test
Under, round hydro
Duct detectors/velocity
Flush
.24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
i
Final
Thrust block pre -pour
/
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
/
Mechanical shutdown
Final
/
D ector test
FIRE SPRINKLER
1
lu a/pre-action
Weld inspection
/
final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
/
Emer ency shut off
High pile storage
/
Primary piping
In -rack sprinklers /
Secondarypping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle mode[lp€acement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
13
Iliana Gutierrez
Subject: FIRE21-0667 TR37576 O/H ROUGH/HYDRO LOT 60
Location: 31103 ALCOVE LN
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: DANIEL
Phone#: 951-703-5210
Thu 6/3/2021 8:30 AM
Thu 6/3/2021 9:00 AM
(none)
Menifee OFM
2
Cell#:
Co. Name: NP MECHANICAL
LXOSSOI: MtAUUVV KUN
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
5