Loading...
31092 ALCOVE LN FIRE21-0659 MEADOW RUN(liana Gutierrez Subject: FIRE21-0659 TR37576 SPK FINAL LOT 29 Location: 31092 ALCOVE LN Start: Wed 9/1/2021 8:00 AM End: Wed 9/1/2021 8:30 AM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: DANIEL Co. Name: NP MECHANICAL Phone#: 951-703-5210 Cell#: CrossSt: MEADOW RUN HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough *'unction test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour , SPECIAL SUPPRESSION Underground rough / Door fan test Underground h dro Abb't test Flush s' Mechanical shutdown Final Detector test FIRE SPRINKLER ► Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle modellplacement H.P. vents/access/corridors Fire alarm conrection Tract access/h drant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extin uill hing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 5 Iliana Gutierrez Subject: FIRE21-0659 TR37576 O/H ROUGH/HYDRO LOT 29 Location: 31092 ALCOVE LN Start: Tue 6/1/2021 8:00 AM End: Tue 6/1/2021 8:30 AM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: DANIEL Phone#: 951-703-5210 Cell#: Co. Name: NP MECHANICAL U[UbbOL. IVIC/AL)Uvv MUIN HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rou h-wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. batbwy test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers i Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 3