Loading...
28954 COPPER RIVER RD FIRE21-1037 TRAILHEAD(liana Gutierrez Subject: FIRE21-1037 TR31098 SPK FINAL LOT 91 Location: 28954 COPPER RIVER RD Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Thu 10/14/2021 10:00 AM Thu 10/14/2021 10:30 AM (none) Menifee OFM 2 Cell#: Co. Name: CrossSt: TRAILHEAD FSS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block re -pour Rough -wire inspection -Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Fina Thrust block pre -pour 32§JML SUPPRESSION Underground rough test Underground hydro t Flush anical shutdown Final / tor test O"T,Delu FIRE SPRINKLERa/pre-action Weld ins ection Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test EmergencyErnwgency shut off High eile storage f Primary piping In -rack sprinklers Secondal piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 7 Iliana Gutierrez Subject: FIRE21-1037 TR31098 O/H ROUGH/HYDRO LOT 91 Location: 28954 COPPER RIVER RD Start: Wed 8/4/2021 3:30 PM End: Wed 8/4/2021 4:00 PM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS ICI U00%_JL. 1 rv-u Ll ICr-�LJ HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test EmeMency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extin uishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 9