27140 GREAT PLAINS CT FIRE21-0740 TRAILHEADIliana Gutierrez
Subject: FIRE21-0740 TR31098 SPK FINAL LOT 22
Location: 27140 GREAT PLAINS CT
Start: Tue 9/14/2021 9:30 AM
End: Tue 9/14/2021 10:00 AM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: HECTOR Co. Name: FSS
Phone#: 951-847-2908 Cell#: CrossSt: TRAILHEAD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rou h-wirViinspection
Underground rough
FunctiorAest
Underground hydro
Duct 06tectors/velocit
Flush
24 Or. battery test
Final
%rinkler monitoring
SPRINKLER U.G.
/Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
i
Abort test
Flush
/
Mechanical shutdown
Final
0
Detector test
FIRE SPRINKLER
Deluge/pre- ction
Weld inspection
A
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
4
1iti5.tallotibn
UG flush / OK to connect
' 46oval
Main drain/Inspect. Test
Emergency shut off
High pile storage
15rimary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Sprav booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow t "t
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
5
(liana Gutierrez
Subject: FIRE21-0740 TR31098 O/H ROUGH/HYDRO LOT 22
Location: 27140 GREAT PLAINS CT
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
Wed 6/30/2021 9:30 AM
Wed 6/30/2021 10:00 AM
(none)
Menifee OFM
2
Cell#:
Co. Name:
FSS
L.AUbbOL. I MM1Lr1r_MU
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Seconda pipin
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
Start Time: Finish Time:
3