27110 SETTLEMENT ST FIRE21-1035 TRAILHEADIliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
FIRE21-1035 TR31098 SPK FINAL LOT 33
27110 SETTLEMENT ST
Thu 10/14/2021 10:30 AM
Thu 10/14/2021 11:00 AM
(none)
Menifee OFM
2
Cell#:
Co. Name: FSSs
Cros,sSt: TRAILHEAD
HYDRANT SYSTEM
PASS
FAIL
FIRE'ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire Apection
Underground rough
Function tAt
Underground hydro
Duct deActors/velocit
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
al
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort tee#,
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
❑elu el re -action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final ZFinal
KITCHEN HOOD EXTINGyfSHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
13
Steven Fox
Subject: FIRE21-1035 TR31098 O/H ROUGH/HYDRO LOT 33
Location: 27110 SETTLEMENT ST
Start: Tue 7/27/2021 3:00 PM
End: Tue 7/27/2021 3:30 PM
Recurrence: (none)
Organizer: Steven Fox
Call Handling Mode 2: 2
Rep. Name: HECTOR
Phone#: 951-847-2908
Cell#:
Co. Name: FSS
CrossSt: TRAILHEAD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
I Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time: Finish Time:
Start Time: Finish Time:
9