24090 KERRIGAN DR FIRE21-0299 SADDLEWOOD II(liana Gutierrez
Subject: FIRE21-0299 TR36484 SPK FINAL LOT 86
Location: 24090 KERRIGAN DRIVE
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Tue 6/15/2021 1:30 PM
Tue 6/15/2021 2:00 PM
(none)
Menifee OFM
2
Rep. Name: J UAN
Phone#: 951-358-9783 Cell#:
Co. Name: FSS
CrossSt: SADDLEWOOD II
HYDRANT SYSTEM
PASS
FAIL
JIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rou h-vjifO inspection
Underground rough
FunctL* test
Underground hydro
Dugfdetectors/velocity
Flush
4 hr. battery test
Final
/Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
J
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X Final A,
Final
KITCHEN HOOD EXTI GUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancv
Start Time:
Finish Time:
Start Time:
Finish Time:
17
Steven Fox
Subject: FIRE21-0299 TR36484 O/H ROUGH/HYDRO LOT 86
Location: 24090 KERRIGAN DR
Start: Thu 5/6/2021 1:30 PM
End: Thu 5/6/2021 2:00 PM
Recurrence: (none)
Organizer: Steven Fox
Call Handling Mode 2: 2
Rep. Name
Phone#:
JUAN
951-358-9783 Cell#:
Co. Name: FSS
CrossSt: SADDLEWOOD II
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
',
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergenc shut off
High pile storage
Primary pipin
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time: