Loading...
24068 TIMBER FARM DR FIRE21-0840 SADDLEWOOD II(liana Gutierrez Subject: FIRE21-0840 TR36484 SPK FINAL LOT 67 Location: 24068 TIMBER FARM DR Start: Mon 9/13/2021 11:00 AM End: Mon 9/13/2021 11:30 AM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: JUAN Co. Name: FSS Phone#: 951-358-9783 Cell#: CrossSt: SADDLEWOOD II HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door Fan test Underground hydro /Abort test Flush Mechanical shutdown Final i Detector test FIRE SPRINKLER Delu /pre -action Weld inspection / Final Overhead rough piping ST/AST TANK Overhead hydro N&tWion UG flush / OK to connect al Main drainllnspect. Test ergency shut off High pile storage'Primary piping In -rack sprinklers / Secondary piping Hose racks Dispensers & shear valves Final i Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: --+Finish Time: 9 Iliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-0840 TR36484 O/H ROUGH/HYDRO LOT 67 24068 TIMBER FARM DR Wed 7/7/2021 9:30 AM Wed 7/7/2021 10:00 AM (none) Menifee OFM 2 Cell#: Co. Name FSS %.AUbbOL. 0/1UULCVV000 HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rou. h Function test Underground hydro Duct detectors/velocity Flush 24 hr. batte test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 7