Loading...
24056 TIMBER FARM DR FIRE21-0841 SADDLEWOOD IIIliana Gutierrez Subject: FIRE21-0841 TR36484 SPK FINAL LOT 66 Location: 24056 TIMBER FARM DR Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Mon 9/13/2021 11:00 AM Mon 9/13/2021 11:30 AM (none) Menifee OFM 2 HYDRANT SYSTEM Thrust block pre -pour Underground rough Underground hydro Flush Final SPRINKLER U.G. Thrust block pre -pour Under round rough Under round hydro Flush Final FIRE SPRINKLER Weld inspection Overhead rough piping Overhead hydro UG flush / OK to connect Main drain/Inspect. Test High pile storage In -rack sprinklers Hose racks X Final KITCHEN HOOD EXTINGUISHING Detection system Function Test Gas/Electrical shut-off Nozzle modeilplacement Fire alarm connection Final SPRAY BOOTHS Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Final Start Time: Finish Time: Start Time: Finish Time: Cell#: PASS FAIL I Co. Name: FSS CrossSt: SADDLEWOOD II FIRE ALARM PASS Rough -wire inspection Function test Duct detectors/velocity 24 hr. batte test Sprinkler monitoring Final SPECIAL SUPPRESSION Door fan test Abort test Mechanical shutdown Detector test elu a/pre-action UST/AST TANK Emergency shut off Primary piping Secondary piping Dispensers & shear valves Final MISC. INSPECTION Spray booths Hood/duct extinguishing High pile rack storage H.P. vents/access/corridors Tract accesslhydrant verification Other: KNOX SYSTEM Building Knox box Gate access Knox box/padlock BUILDING INSPECTIONS T/I final Shell final Final for occuoancv FAIL 7 Iliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-0841 TR36484 O/H ROUGH/HYDRO LOT 66 24056 TIMBER FARM DR Wed 7/7/2021 9:30 AM Wed 7/7/2021 10:00 AM (none) Menifee OFM 2 Cell#: Co. Name: FSS CrossSt: SADDLEWOOD HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection , Final X Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 5