Loading...
2021/10/11 I.E. General Engineering, Inc. Antelope Road Raised Median Improvement CIP 19-03Page 1 of 2 DESCRIPTION OF CHANGES AND/OR EXTRA WORK: BID ITEM U/M QUANTITY % CHANGE UNIT PRICE TOTAL 5 LF 160 -3.40 1.00$ ($160.00) 6 SF 3060.22 -9.76 2.10$ ($6,426.46) 7 CY 53.98 -6.31 55.00$ ($2,968.90) 8 LF 187 -0.73 17.00$ ($525.30) 9 SF 644.60 -7.32 6.00$ ($3,867.60) 10 SF 52.55 6.08 10.00$ 525.50$ 11 CY 79.66 7.35 50.00$ 1,750.00$ 12 TON 10.37 2.03 125.00$ 1,296.25$ 13 SF 197.60 -2.15 1.50$ ($296.40) 15 SF 90.80 2.62 8.00$ 726.40$ TOTAL ESTIMATED PRICE FOR THIS CHANGE ORDER:($9,946.51) JUSTIFICATION:Please see attached Quantity Calculation Sheets from Field measurements for overage of Bid Items. PROJECT NAME: PROJECT NO: CONTRACTOR: Remove Existing AC Pavement and Aggregate Base Unclassified Excavation (including Subgrade Preparation) Construct 8" 8A Median Curb per City of Construct 3" DG Median (Section 200-5 of Antelope Road Raised Median Improvement Project The Contractor is hereby directed to make the herein described changes from the plans and specifications and/or perform the following described work not included in the Plans and Specifications for this project. Work items shall include labor, materials, neccesary for the performance and completion of the additional work.equipment, traffic control, and incidentals 10/11/2021DATE: Grind and Overlay Construct 4" PCC Median per City of Menifee Standard 130 Construct 1.5' Wide PCC Maintenance Walk per City of Menifee Standard 130 Class 2 Aggregate Base Construct 6" PG 70-10 Asphalt Concrete with Tack Coat additional Working Days will be granted to the Contractor due To - N/A CIP 19-03 IE General Engineering Inc. This document shall become an amendment to the Contract and all provisions of the Contract will apply hereto. This Change Order constitutes a complete and final resolution of all claims of the Contract for additional time or additional compensation related to or affected by work that is the subject of this Change Order. Quantities of items other than Lump Sum are not to exceed the amounts indicated. DESCRIPTION Sawcut Existing AC Pavement C:\Users\Ryan Moore\Dropbox\CIP 19-03 Menifee\10.00 Change Order\10.02 CCO-002\CCO No. 02 - Quantity Overage & Credit to the Contract DocuSign Envelope ID: 80F543EE-2972-4EE6-A66A-049D3C4E761A Page 2 of 2 CCO #Amount % Additional Time Date Approved 1 $4,125.00 5 Working Days 10/19/2021 2 -$9,946.51 Totals -$5,821.51 June 28, 2021 September 7, 2021 5 September 14, 2021 AUTHORIZATION BY CITY: Recommended for approval by: Date: ______________________________________________Date: __________ Tom Berg, PE Carlos E. Geronimo, PE Construction Manager Project Manager Approved by: Date: ______________________________________________Date: __________ Nicolas Fidler, PE Armando G. Villa Public Works Director/City Enigineer City Manager ACCEPTANCE BY CONTRACTOR: Accepted by: _____________________________________________________Date: ____________________________ Signature _____________________________________________________ Please print name and title Additional Stripping - Realignment Description 507,115.00$ Previous Change Order Amounts: Current Change Order Amount: Revised Contract Amount: Original Contract Amount: 4,125.00$ (9,946.51)$ 501,293.49$ ________________________________________ Revised Completion Date: ____________________________________________ Overage and Credit to the Contract CONTRACT VARIANCE SUMMARY We, the undersigned Contractor, have given careful consideration to the above described changes and/or extra work and hereby agree that said work is a supplement to the contract and all provisions will apply hereto. Date Started: Original Completion Date: Additional Time (Working Days) C:\Users\Ryan Moore\Dropbox\CIP 19-03 Menifee\10.00 Change Order\10.02 CCO-002\CCO No. 02 - Quantity Overage & Credit to the Contract 10/21/21 DocuSign Envelope ID: 80F543EE-2972-4EE6-A66A-049D3C4E761A 11/15/2021 11/15/2021 11/16/2021