Loading...
24611 LEGION CIRCLE FIRE21-0351 VALOR WEST(liana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-0351 TR36485 SPK FINAL LOT 28 24611 LEGION CIRCLE Tue 8/17/2021 10:30 AM Tue 8/17/2021 11:00 AM (none) Menifee OFM 2 Cell#: Co. Name: FSS VI V00%JL. VP'LL-VI\ VVLJI HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour I F3pugh-wire inspection Under round rough 10runction test Underground hydro Duct detectors/velocity Flush 24 hr. batteDL test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Under round hydro Abort test Flush J Mechanical shutdown Final Z 4L Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping / UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/inspect. Test Emergency shut off High eile storage Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOO XTINGUISHING MISC. INSPECTION Detection systerif Spray booths Function Test Hood/duct extinguishing Gas/Electric shut-off High pile rack storage Nozzle molfeitplacement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation BuildingKnox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 5 Iliana Gutierrez Subject: FIRE21-0351 TR36485 O/H ROUGH/HYDRO LOT 28 Location: 24611 LEGION CIRCLE Start: Mon 5/17/2021 11:00 AM End: Mon 5/17/2021 11:30 AM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name FSS t-AU550l: VHLUM VVCJ I HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping �,',' UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: J.� ' i yed l ? Start Time: Finish Time: 13 �W Vi dam' U C C i F V'vf 6f -b(%A