Loading...
24589 LEGION CIRCLE FIRE21-0349 VALOR WESTIliana Gutierrez Subject: FIRE21-0349 TR36485 SPK FINAL LOT 26 Location: 24589 LEGION CIRCLE Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Tue 8/17/2021 10:30 AM Tue 8/17/2021 11:00 AM (none) Menifee OFM 2 Co. Name: FSS Cell#: / CrossSt: AF VALOR WEST HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour ./Rou h-wire inspection Underground rough A Function test Underground hydro J Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block re -pour SPECIAL SUPPRESSION Under round rough Door fan test Under round hydro Abort test Flush Z Mechanical shutdown Final Detector test FIRE SPRINKLER Ilk Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro 4 Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Seconda piping Hose racks Dispensers & shear valves X Final Final KITCHEN HO EXTINGUISHING MISC. INSPECTION Detection s s m Spray booths Function Tqd Hood/duct extinguishing Gas/Ele cal shut-off High pile rack storage Nozzt made#/ lacement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 9 (liana Gutierrez Subject: FIRE21-0349 TR36485 O/H ROUGH/HYDRO LOT 26 Location: 24589 LEGION CIRCLE Start: Mon 5/17/2021 10:30 AM End: Mon 5/17/2021 11:00 AM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS CrossSt: VALOR WEST HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: I Finish Time: 9