Loading...
24572 LEGION CIRCLE FIRE21-0354 VALOR WEST(liana Gutierrez Subject: FIRE21-0354 TR36485 SPK FINAL LOT 50 Location: 24572 LEGION CIRCLE Start: Tue 8/17/2021 11:00 AM End: Tue 8/17/2021 11:30 AM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: JUAN Co. N e: FSS Phone#: 951-358-9783 Cell#: CrossSt: VALOR WEST HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough ° Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Delu e/ re -action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD'EXTINGUISHING MISC. INSPECTION Detections to Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: I Finish Time: 11 (liana Gutierrez Subject: FIRE21-0354 TR36485 O/H ROUGH/HYDRO LOT 50 Location: 24572 LEGION CIRCLE Start: Mon 5/17/2021 11:30 AM End: Mon 5/17/2021 12:00 PM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS CrossSt: VALOR WEST HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Under round rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -racks rinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupanc Start Time: Finish Time: P, p eQ Q S— i, Start Time: Finish Time: 15 �D V PiV l vcc4i %t � rnn