24560 LEGION CIRCLE FIRE21-0608 VALOR WEST0
(liana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
FIRE21-0608 TR36485 SPK FINAL LOT 51
24560 LEGION CIRCLE
Thu 9/16/2021 11:30 AM
Thu 9/16/2021 12:00 PM
(none)
Menifee OFM
2
Rep. Name: JUAN
Phone#: 951-358-9783 Cell#:
Co. Name: FSS
%Jl VilAJL. VPILVI% YY LV I
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
I
Rod h-wire inspection
Underground rough
Function test
Under round hydro
uct detectors/velocity
Flush
/
24 hr. battery test
Final
/
Sprinkler monitoring
SPRINKLER U.G.
/
Final
Thrust block pre -pour
/
SPECIAL SUPPRESSION
Underground rough
/
Door fan test
Underground hydro
/®Removal
bort test
Flush
/
cal shutdown
Final
i
or test
FIRE SPRINKLER
lu e/ re -action
Weld inspection
nal
Overhead rough piping
UST/AST TANK
Overhead hydro
stallation
UG flush / OK to connect
Main drain/Inspect. Test
Emergency shut off
Hi h pile storage i
Primary piping
In-racksprinklers
Secondary piping
Hose racks '
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUI$fAING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model! laceme
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
G
(liana Gutierrez
Subject: FIRE21-0608 TR36485 O/H ROUGH/HYDRO LOT 51
Location: 24560 LEGION CIRCLE
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
Tue 6/15/2021 1:00 PM
Tue 6/15/2021 1:30 PM
(none)
Menifee OFM
2
Cell#:
Co. Name
FSS
%.AUSJJI. VPILUR VVCJ I
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block re -pour
Rough -wire inspection
Underground rou h
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
J Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping"`
UST/AST TANK
X
Overhead hydro
; ;;'
Installation
UG flush / OK to connect
<
Removal
Main drain/Inspect. Test
Emer ency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
15
(liana Gutierrez
Subject:
FIRE21-0608 TR36485 O/H ROUGH/HYDRO LOT 51
Location:
24560 LEGION CIRCLE
Start:
Wed 6/9/2021 11:30 AM
End:
Wed 6/9/2021 12:00 PM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: JUAN
Phone#: 951-358-9783
Cell#:
Co. Name:
FSS
UFU5501: VHLUM VVCJ I
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro,
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
,
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Seconda pipin
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
JWQ+
romnMeJ -6 V"A4J*aYVtM01
Start Time:
Finish Time:
15 CPv+ NW; I K krwfa) U