24553 LEGION CIRCLE FIRE21-0611 VALOR WESTIliana Gutierrez
Subject: FIRE21-0611 TR36485 SPK FINAL LOT 24
Location: 24553 LEGION CIRCLE
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
Thu 9/16/2021 12:00 PM
Thu 9/16/2021 12:30 PM
(none)
Menifee OFM
2
Co. Name: FSS
Cell#: CrossSt: VALOR WEST
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Under round hydro
`
Duct detectors/velocity
Flush
j
24 hr. battery test
Final
%
S rinkler monitoring
SPRINKLER U.G.
/
Final
Thrust block pre -pour
/
SPECIAL SUPPRESSION
Under round rough
/
Door fan test
Under round hydro
rt test
Flush
echanical shutdown
Final
ietector
test
FIRE SPRINKLER
ORemoval
Delu e/ re -action
Weld ins ection
Final
Overhead rough pipin
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary i in
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUI$WNG
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY 50OTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test 1
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
9
Iliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
FIRE21-0611 TR36485 O/H ROUGH/HYDRO LOT 24
24553 LEGION CIRCLE
Wed 6/9/2021 11:00 AM
Wed 6/9/2021 11:30 AM
(none)
Menifee OFM
2
Cell#:
Co. Name: FSS
CrossSt: VALOR WEST
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spraybooths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
9