Loading...
24512 DIVISION DR FIRE21-0582 VAQUERO(liana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JOE Phone#: 951-595-5423 FIRE21-0582 TR36485 SPK FINAL LOT 34 24512 DIVISION DR Thu 7/15/2021 9:00 AM Thu 7/15/2021 9:30 AM (none) Steven Fox 2 Cell#: Co. Name NP MECHANICAL VI LJAAJL. V/-%WU Cf\V HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sponkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test I Hood/duct extinguishing GaslElectricaf shut-off High pile rack storage Nozzle wadel/placernent H.P. vents/access/corridors Fire.a#brm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occuoancv Start Time: Finish Time: Start Time: Finish Time: L� Steven Fox Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JOE Phone#: 951-595-5423 FIRE21-0582 TR36485 O/H ROUGH/HYDRO LOT 34 24512 DIVISION DR Thu 4/29/2021 10:30 AM Thu 4/29/2021 11:00 AM (none) Steven Fox 2 Cell#: Co. Name: NP MECHANICAL M L91; 1-7.1 �Vff;XW to -1 DAM HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rou h-wire inspection Underground rough Function test Under round hydro Duct detectors/velocit Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emer ency shut off High pile storage Primary piping In -rack sprinklers Seconda piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 5