31168 BOWERY CT FIRE21-0165 MEADOW RUNIliana Gutierrez
Subject:
FIRE21-0165 TR37576 SPK FINAL LOT 11
Location:
31168 BOWERY CT
Start:
Wed 5/19/2021 9:00 AM
End:
Wed 5/19/2021 9:30 AM
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: DANIEL
Phone#: 951-703-5210
(none)
Menifee OFM
2
Cell#:
Co. Name: NP MECHANICAL
%AU550L. ivir_tiuvvv MUIN
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection ter.
Final
Overhead rough piping
UST/AST TANK
Overhead hydro A
Installation
UG flush / OK to connect
Removal
Emergency shut off
Main drain/Inspect. TV
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHO HOOD EXTINGUISHING
MISC. INSPECTION
Detect' n s stem
Spray booths
Fu lon Test
Hood/duct extinguishing
s/Electrical shut-off
High pile rack storage
-'Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time-
Start Time: Finish Time:
7
Steven Fox
Subject: FIRE21-0165 TR37576 O/H ROUGH/HYDRO LOT 11
Location: 31168 BOWERY CT
Start: Wed 3/3/2021 2:00 PM
End: Wed 3/3/2021 2:30 PM
Recurrence: (none)
Organizer: Steven Fox
Call Handling Mode 2: 2
Rep. Name: DANIEL
Phone#: 951-703-5210
Cell#:
Co. Name: NP MECHANICAL
CrossSt: MEADOW RUN
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block ore -Dour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
r`;
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
29