Loading...
31151 ALCOVE LN FIRE21-0607 MEADOW RUN(liana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: DANIEL Phone#: 951-703-5210 FIRE21-0607 TR37576 SPK FINAL LOT 64 31151 ALCOVE LN Tue 8/17/2021 1:00 PM Tue 8/17/2021 1:30 PM (none) Menifee OFM 2 Cell#: Co. Name: NP MECHANICAL CrossSt: MEADOW RUN HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detect s/velocit Flush 24 hr. baAry test Final S rin r monitoring SPRINKLER U.G. Fi Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER �. u e/ re -action Weld inspection & ip't:inal Overhead rough piping , UST/AST TANK Overhead hydro Installation UG flush / OK to connect 0or Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINOUSHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut -OR High pile rack storage Nozzle model/pla ment H.P. vents/access/corridors Fire alarm con ction Tract access/hydrant verification Final Other: RAY BOOTHS KNOX SYSTEM lnstallatijffi Building Knox box Air fla test Gate access Knox box/padlock Me anical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 7 Iliana Gutierrez Subject: FIRE21-0607 TR37576 O/H ROUGH/HYDRO LOT 64 Location: 31151 ALCOVE LN Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: DANIEL Phone#: 951-703-5210 Tue 5/11/2021 11:00 AM Tue 5/11/2021 11:30 AM (none) Menifee OFM 2 Cell#: Co. Name: NP MECHANICAL %-olUbbOL. rvir-r%uvvv MUN HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping ti UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation BuildingKnox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 21