Loading...
31144 BOWERY CT FIRE21-0166 MEADOW RUNIliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: DANIEL Phone#: 951-703-5210 FIRE21-0166 TR37576 SPK FINAL LOT 13 31144 BOWERY CT Wed 5/19/2021 9:30 AM Wed 5/19/2021 10:00 AM (none) Menifee OFM 2 Cell#: Co. Name NP MECHANICAL VI VJAVI. IVIL/-%VVVV FNUVA HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monigdng SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Dgor fan test Underground hydro ; Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection , Final Overhead rough piping / UST/AST TANK Overhead hydro 1 Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Seconds piping Hose racks X Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection syste7m Spray booths Function Te t Hood/duct extinguishing Gas/Ele�erical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 15 Steven Fox Subject: FIRE21-0166 TR37576 O/H ROUGH/HYDRO LOT 13 Location: 31144 BOWERY CT Start: Wed 3/3/2021 2:30 PM End: Wed 3/3/2021 3:00 PM Recurrence: (none) Organizer: Steven Fox Call Handling Mode 2: 2 Rep. Name: DANIEL Phone#: 951-703-5210 Cell#: Co. Name: NP MECHANICAL 1r1U5,01. IVICFILJUVV MUIV HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping iC UST/AST TANK X Overhead hydro ' Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary pipin In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 31