31140 ALCOVE LN FIRE21-0602 MEADOW RUN(liana Gutierrez
Subject: FIRE21-0602 TR37576 SPK FINAL LOT 25
Location: 31140 ALCOVE LN
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2
Rep. Name: DANIEL
Phone#: 951-703-5210
Tue 8/17/2021 12:30 PM
Tue 8/17/2021 1:00 PM
(none)
Menifee OFM
2
Cell#:
Co. Name:
NP MECHANICAL
urubsot: 1y1r_AUUyy MUN
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Under round rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
NL
JiWetector
test
FIRE SPRINKLER
Deluge/pre-action
Final
Weld inspection
Overhead rough piping J
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test ZEmergency
shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD: EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test.
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle v6del/placement
H.P. vents/access/corridors
Firp..alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
t
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
5
(liana Gutierrez
Subject: FIRE21-0602 TR37576 O/H ROUGH/HYDRO LOT 25
Location: 31140 ALCOVE LN
Start: Tue 5/11/2021 10:00 AM
End: Tue 5/11/2021 10:30 AM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: DANIEL
Phone#: 951-703-5210
Cell#:
Co. Name
NP MECHANICAL
ur055Ji: IVICHUUVV KUIV
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
I
I Finish Time:
13