31128 ALCOVE LN FIRE21-0603 MEADOW RUN(liana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: DANIEL
Phone#: 951-703-5210
FIRE21-0603 TR37576 SPK FINAL LOT 26
31128 ALCOVE LN
Tue 8/17/2021 12:30 PM
Tue 8/17/2021 1:00 PM
(none)
Menifee OFM
2
Cell#:
Co. Name:
NP MECHANICAL
%flU27 OLl rviFZrwUvv rwiy
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block re -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
001F 141L
Mechanical shutdown
Final Z
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
11111110a
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to conneck7
Removal
Main drain/Inspect. Test
Emer enc shut off
High pile storage
Primary piping
In -rack sprinklers:
Secondary piping
Hose racks Z
Dispensers & shear valves
X
Final
Final
KITCHEN HOOT] EXTINGUISHING
MISC. INSPECTION
DetectiQv system
Spray booths
Function Test
Hood/duct extinguishing
Ga,VElectrical shut-off
High pile rack storage
Ndzzle model/placement
H.P. vents/access/corridors
,oFire
alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
3
Iliana Gutierrez
Subject: FIRE21-0603 TR37576 O/H ROUGH/HYDRO LOT 26
Location: 31128 ALCOVE LN
Start: Tue 5/11/2021 10:30 AM
End: Tue 5/11/2021 11:00 AM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: DANIEL
Phone#: 951-703-5210
Cell#:
Co. Name: NP MECHANICAL
CrossSt: MEADOW RUN
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
ly
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
19