Loading...
31116 ALCOVE LN FIRE21-0604 MEADOW RUN(liana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: DANIEL Phone#: 951-703-5210 FIRE21-0604 TR37576 SPK FINAL LOT 27 31116 ALCOVE LN Tue 8/17/2021 12:30 PM Tue 8/17/2021 1:00 PM (none) Menifee OFM 2 Cell#: Co. Name: NP MECHANICAL CrossSt' MEADOW RUN HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rou h-wire ins ection Underground rough Function test Under round hydro Duet`detectors/velocit Flush AA hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Ar Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro 10 Abort test Flush Z op, Mechanical shutdown Final Detector test FIRE SPRINKLER IL Delu a/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks 4 Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection s m Spray booths Function At Hood/duct extinguishing Gas/Ele rical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupant Start Time: Finish Time: Start Time: I Finish Time: 1 (liana Gutierrez Subject: FIRE21-0604 TR37576 O/H ROUGH/HYDRO LOT 27 Location: 31116 ALCOVE LN Start: Tue 5/11/2021 10:30 AM End: Tue 5/11/2021 11:00 AM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: DANIEL Phone#: 951-703-5210 Cell#: Co. Name NP MECHANICAL U D55Ji: IVICHUVVy KUN HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection / Final X Overhead rough piping UST/AST TANK X Overhead hydro ` Installation UG flush / OK to connect \ Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 17