27441 GEORGETOWN DR FIRE21-0385 THE TOWNES(liana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
FIRE21-0385 TR37178 SPK FINAL LOT 24
27441 GEORGETOWN DR
Tue 8/3/2021 9:30 AM
Tue 8/3/2021 10:00 AM
(none)
Menifee OFM
2
Cell#:
Co. Name
FSS
VI V00%7l. I FlC I \JVV IVCO
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
QCict detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
4
Door fan test
Under round hydro
Abort test
Flush
Mechanical shutdown
Final
r
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping Z
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Emergency shut off
Primary piping
Main drain/Inspect. Tesv M
High pile storage
In-racksprinklers :.
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEI+1 HOOD EXTNPUISHING
MISC. INSPECTION
Detectio system
Spray booths
Function Test
Hood/duct extinguishing
Gagtfectrical shut-off
High pile rack storage
No6xle model/placement
H.P. vents/access/corridors
,Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
BuildingKnox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
I Finish Time:
19
Steven Fox
Subject: FIRE21-0385 TR37178 O/H ROUGH/HYDRO LOT 24
Location: 27441 GEORGETOWN DRIVE
Start: Wed 4/21/2021 9:00 AM
End: Wed 4/21/2021 9:30 AM
Recurrence: (none)
Organizer: Steven Fox
Call Handling Mode 2: 2
Rep. Name: HECTOR
Phone#: 951-847-2908
Cell#:
Co. Name: FSS
UFU550U 1 r9t 1 UVVIVCJ
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hv_ dro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
i.
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
9