Loading...
29800 OLYMPIC DR FIRE20-0250 CHELSEASteven Fox Subject: FIRE20-0250 TR34406-6 SPK FINAL LOT 20 Location: 29800 OLYMPIC DRIVE Start: Wed 6/17/2020 8:30 AM End: Wed 6/17/2020 9:00 AM Recurrence: Organizer: Rep. Name: HECTOR Phone#: 951-847-29n.9 HYDRANT SYSTEM Thrust block pre -pour Underground rough Underground hydro Flush Final SPRINKLER U.G. Thrust block ore -hour (none) Steven Fox Underground hydro Flush Final FIRE SPRINKLER Weld inspection Overhead rough piping Overhead hydro UG flush / OK to connect Main drain/Inspect, Test High pile storage In -rack sprinklers Hose racks X Final KITCHEN HOOD EXTINGUISHING Detection system Function Test Gas/Electrical shut-off Nozzle model/placement Fire alarm connection Final SPRAY BOOTHS Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Final Start Time: Finish Time: Start Time: L I Finish Time: Cell#: PASS FAIL Co. Name: FSS CrossSt: CHELSEA FIRE ALARM Rough -wire inspection Function test Duct detectors/velocity 24 hr. battery test Sprinkler monitoring Final SPECIAL SUPPRESSION Door fan test Abort test Mechanical shutdown Detector test Delugelpre-action Final UST/AST TANK Installation Removal Emergency shut off Primary piping Secondary piping Dispensers & shear valves Final MISC. INSPECTION Spray booths Hood/duct extinguishing High pile rack storage H.P. vents/access/corridors Tract access/hydrant verification Other: KNOX SYSTEM Building Knox box Gate access Knox box/padlock BUILDING INSPECTIONS T/I final Shell final Final foroccuoancv PASS I FAIL 9 Bernice Rivera Subject: FIRE20-0250 TR34406-6 O/H ROUGH/HYDRO LOT 20 Location: 29800 OLYMPIC DR Start: Tue 3/31/2020 1:30 PM End: Tue 3/31/2020 2:00 PM Recurrence: (none) Rep. Name: HECTOR-CARLOS Co. Name: FSS Phone#: 951 847-2908 CrossSt: CHELSEA Cell#: PASS FAIL HYDRANT SYSTEM Thrust block pre -pour PASS FAIL FIRE ALARM Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final I Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping U00, UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect- Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupant Start Time: Finish Time: Start Time: Finish Time: