Loading...
29706 EVERGLADES DR FIRE20-0389 CHELSEAIliana Gutierrez Subject: FIRE20-0389 TR34406-6 SPK FINAL LOT 12 Location: 29706 EVERGLADES DR Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 Tue 8/11/2020 11:30 AM Tue 8/11/2020 12:00 PM (none) Menifee OFM 2 Cell#: Co. Name: FSS %i[UJ,JI. UrlCLJC/1 HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/veto Flush 24 hr. battery test Final Sprinkler mgnftoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough od-or fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage ► Primary piping In -rack sprinklers 64OF OF Secondary piping Hose racks Dispensers & shear valves C Final AF Final KITCHEN HOOqAXTINGUISHING MISC. INSPECTION Detection syste itSpray booths Function TesJr Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 23 Iliana Gutierrez Subject: FIRE20-0389 TR34406 O/H ROUGH/HYDRO LOT 12 Location: 29706 EVERGLADES DR Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 Wed 5/27/2020 1:00 PM Wed 5/27/2020 1:30 PM (none) Menifee OFM 2 Cell#: Co. Name: FSS CrossSt: CHELSEA HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: I I Finish Time: