27539 GOODHOPE DR FIRE20-0061 HAMPTONIliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Rep. Name: HECTOR
Phone#: 951-847-2908
FIRE20-0061 TR34406-3 SPK FINAL LOT 130
27539 GOODHOPE DR
Tue 6/16/2020 10:30 AM
Tue 6/16/2020 11:00 AM
(none)
Menifee OFM
Cell#:
Co. Name:
FSS.
�.1 uz�'ok. nr%ivir i v114
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wiry: inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
1,rinal
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
10
1Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
/
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/plagprnent
H.P. vents/access/corridors
Fire alarm connjftion
Tract access/hydrant verification
Final AtOther:
qfRAY BOOTHS
KNOX SYSTEM
Installation.'
Building Knox box
Air flow Fit
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
15
Bernice Rivera
Subject:
Location:
Start:
End:
Recurrence:
Rep. Name
Phone#:
FIRE20-0061 TR34406-3 O/H ROUGH/HYDRO LOT 130
27539 GOODHOPE DR
Tue 3/24/2020 11:00 AM
Tue 3/24/2020 11:30 AM
(none)
HECTOR-CARLOS
51) 847-2908 Cell#:
Co. Name: FSS
CrossSt: HAMPTON
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
L
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
StartTime:
Finish Time: