27498 GOODHOPE DR FIRE20-0065 HAMPTON(liana Gutierrez
Subject: FIRE20-0065 TR34406-3 SPK FINAL LOT 147
Location: 27498 GOODHOPE DR
Start: Tue 6/16/2020 9:30 AM
End: Tue 6/16/2020 10:00 AM
Recurrence: (none)
Organizer: Menifee OFM
Rep. Name: HECTOR
Co. Name: FSS
Phone#: 951-847-2908 Cell#:
CrossSt: HAMPTON
HYDRANT SYSTEM PASS
FAIL FIRE ALARM PASS FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
l9prinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
AF I Door fan test
Underground hydro
le Abort test
Flush
Mechanical shutdown
Final
-Ao
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
orFinal
Overhead rough piping
UST/AST TANK
Installation
Overhead hydro Al
UG flush / OK to connect
Removal
Main drain/Inspect. Test ""
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model) lacement
H.P. vents/access/corridors
Fire alarm conection
Tract access/hydrant verification
Final 4Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
Start Time: I Finish Time:
Bernice Rivera
Subject: FIRE20-0065 TR34406-3 O/H ROUGH/HYDRO LOT 147
Location: 27498 GOODHOPE DR
Start: Tue 3/24/2020 2:00 PM
End: Tue 3/24/2020 2:30 PM
Recurrence: (none)
Rep. Name: HECTOR-CARLOS Co. Name:
Phone#: 951) 847-2908 Cell#:
FSS
CrossSt: HAMPTON
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X Overhead rou h piping
UST/AST TANK
X Overhead hydro
C
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time: