27497 ESTERO DR FIRE21-0569 HAMPTON(liana Gutierrez
Subject: FIRE21-0569 TR34406 SPK FINAL LOT 32
Location: 27497 ESTERO DR
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
Thu 8/12/2021 11:30 AM
Thu 8/12/2021 12:00 PM
(none)
Menifee OFM
2
Cell#:
Co. Name: FSS ot
Cross . HAMPTON
HYDRANT SYSTEM
PASS
FAIL
FIR54LARM
PASS
FAIL
Thrust block pre -pour
I Rough-wireOpection
Underground rough
I Function At
Under round hydro
I Duct d ctors/velocit
Flush
1 24 Vbattery test
Final
inkler monitoring
SPRINKLER U.G.
LOPinal
Thrust block pre -pour
SPECIAL SUPPRESSION
Under round rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
DeLector test
FIRE SPRINKLER
el /pr -action
Weld inspection
Overhead rough piping
L UST/AST TANK
Overhead hydro
allation
UG flush / OK to connect
10
â–ºRemoval
Main drain/Inspect. Test
EmergencyEmergen2y shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispense & shear valves
X
Final
Final
KITCHEN HOOD EXTIN ISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shu
High pile rack storage
Nozzle model) cement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extin ui hing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
11
Steven Fox
Subject: FIRE21-0569 TR34406 O/H ROUGH/HYDRO LOT 32
Location: 27497 ESTERO DR
Start: Wed 5/5/2021 10:30 AM
End: Wed 5/5/2021 11:00 AM
Recurrence: (none)
Organizer: Steven Fox
Call Handling Mode 2: 2
Rep. Name: JUAN
Phone#: 951-358-9783
Cell#:
Co. Name: FSS
MVNNr1�mVOVAInd M\I
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rou h-wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
Kj
UST/AST TANK
X
Overhead hydro
i0
Installation
UG flush / OK to connect
1
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing_
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupanc
Start Time:
Finish Time:
Start Time:
Finish Time:
23