Loading...
27497 ESTERO DR FIRE21-0569 HAMPTON(liana Gutierrez Subject: FIRE21-0569 TR34406 SPK FINAL LOT 32 Location: 27497 ESTERO DR Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Thu 8/12/2021 11:30 AM Thu 8/12/2021 12:00 PM (none) Menifee OFM 2 Cell#: Co. Name: FSS ot Cross . HAMPTON HYDRANT SYSTEM PASS FAIL FIR54LARM PASS FAIL Thrust block pre -pour I Rough-wireOpection Underground rough I Function At Under round hydro I Duct d ctors/velocit Flush 1 24 Vbattery test Final inkler monitoring SPRINKLER U.G. LOPinal Thrust block pre -pour SPECIAL SUPPRESSION Under round rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final DeLector test FIRE SPRINKLER el /pr -action Weld inspection Overhead rough piping L UST/AST TANK Overhead hydro allation UG flush / OK to connect 10 ►Removal Main drain/Inspect. Test EmergencyEmergen2y shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispense & shear valves X Final Final KITCHEN HOOD EXTIN ISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shu High pile rack storage Nozzle model) cement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extin ui hing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 11 Steven Fox Subject: FIRE21-0569 TR34406 O/H ROUGH/HYDRO LOT 32 Location: 27497 ESTERO DR Start: Wed 5/5/2021 10:30 AM End: Wed 5/5/2021 11:00 AM Recurrence: (none) Organizer: Steven Fox Call Handling Mode 2: 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS MVNNr1�mVOVAInd M\I HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rou h-wire inspection Under round rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping Kj UST/AST TANK X Overhead hydro i0 Installation UG flush / OK to connect 1 Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing_ Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupanc Start Time: Finish Time: Start Time: Finish Time: 23