Loading...
27491 GOODHOPE DR FIRE20-0059 HAMPTON(liana Gutierrez Subject: FIRE20-0059 TR34406-3 SPK FINAL LOT 128 Location: 27491 GOODHOPE DR Start: Tue 6/16/2020 10:00 AM End: Tue 6/16/2020 10:30 AM Recurrence: (none) Organizer: Menifee OFM Rep. Name: HECTOR Co. Name: Phone#: 951-847-2908 Cell#: FSS CrossSt: HAMPTON HYDRANT SYSTEM PASS FAIL FIRE ALARM. PASS FAIL Thrust block pre -pour Rough -wire inspection.. Underground rough Function test '� Underground hydro Duct detectorsiAlocity Flush 24 hr. batte •. "Test Final SprinkleMffionitoring SPRINKLER U.G. FinaLOF Thrust block pre -pour I OF SPECIAL SUPPRESSION Underground rough oor fan test Underground hydro Abort test Flush ec nical shutdown Final 40, ctor test FIRE SPRINKLER Deluge/pre-action Final Weld inspection Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect AL Removal Main drain/Inspect. Test Emergency shut off High pile storage 1. Primary piping In -rack sprinklers I' Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTIJWIISUISHING MISC. INSPECTION Detection system Spray booths Function Test ly Hood/duct extinguishing Gas/Electrical shLAff High pile rack storage Nozzle model/p ement H.P. vents/access/corridors Fire alarm co ection Tract access/hydrant verification Final Other: PRAY BOOTHS KNOX SYSTEM Insta on Building Knox box Air :law test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: Bernice Rivera Subject: FIRE20-0059 TR34406-3 O/H ROUGH/HYDRO LOT 128 Location: 27491 GOODHOPE DR Start: Tue 3/24/2020 10:00 AM End: Tue 3/24/2020 10:30 AM Recurrence: (none) Organizer: Menifee OFM Rep. Name: HECTOR-CARLOS Phone#: (951) 847-2908 Cell#: Co. Name: FSS CrossSt: HAMPTON HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping ;a( UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: