27461 ESTERO DR FIRE21-0572 HAMPTON(liana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
FIRE21-0572 TR34406 SPK FINAL LOT 35
27461 ESTERO DR
Thu 8/12/2021 11:30 AM
Thu 8/12/2021 12:00 PM
(none)
Menifee OFM
2
Cell#:
Co. Name: FSS
CrossSt- HAMPTON
HYDRANT SYSTEM
PASS
FAIL
FIRE ARM
PASS
FAIL
Thrust block ere -pour
I Rough -wire i action
Under round rough
I Function t
Under round hydro
Duct d ctors/velocit
Flush
24 baftwy test
Final
I 50rinkler monitoring
SPRINKLER U.G.
final
Thrust block pre -pour
,/
SPECIAL SUPPRESSION
Under round rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Dete r test
FIRE SPRINKLER
ction
Weld inspection
i
Overhead rough piping
UST/AST TANK
Overhead hydro
0OF
stallation
UG flush / OK to connect
Removal
Main drain/inspect, Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXT GUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical s -off
High pile rack storage
Nozzle mad lacement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extin ui hing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
9
Steven Fox
Subject:
FIRE21-0572 TR34406 O/H ROUGH/HYDRO LOT 35
Location:
27461 ESTERO DR
Start:
Fri 5/7/2021 10:00 AM
End:
Fri 5/7/2021 10:30 AM
Recurrence:
(none)
Organizer:
Menifee OFM
Call Handling Mode 2:
2
Rep. Name: JUAN
Phone#: 951-358-9783
Cell#:
Co. Name: FSS
%AUbbOL. rU1Ivir- 1 %JIV
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Under round hyAro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
1C
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
13