28110 SCHOLA DR FIRE20-0610 SALERNOIliana Gutierrez
Subject: ZOOM FIRE20-0610 TR29835 SPK FINAL LOT 54
Location: 28110 SCHOLA DR
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Tue 9/29/2020 2:30 PM
Tue 9/29/2020 3:00 PM
(none)
Menifee OFM
2
Rep. Name: JUAN
Phone#: 951-858-7939 Cell#:
Co. Name: NP MECHANICAL
I-AUbbOL. J/iLMMINU
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block re -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler ` monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
PDoor fan test
Under round hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
16VInstallation
UG flush / OK to connect
Removal
Main drain/Inspect. Test s
'
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Seconda ry piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EX GUISHING
MISC. INSPECTION
Detections stem Z
Spray booths
Function Test 4
Hood/duct extinguishing
Gas/Electrical t-off
High pile rack storage
Nozzle mod placement
H.P. vents/access/corridors
Fire alarm..66nnection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
17
Steven Fox
Subject: FIRE20-0610 TR29835-1 O/H ROUGH/HYDRO LOT 54
Location: 28110 SCHOLA DR
Start: ` Mon 7/13/2020 1:30 PM
End: Mon 7/13/2020 2:00 PM
Recurrence: (none)
Organizer: Steven Fox
Rep. Name: DANIEL Co. Name: NP MECHANICAL
Phone#: 951-703-5210 Cell#: CrossSt: SALERNO
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X Overhead rough piping
r
UST/AST TANK
X Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
19