Loading...
27427 CALABRIA CT FIRE21-0653 SALERNO(liana Gutierrez Subject: FIRE21-0653 TR29835 SPK FINAL LOT 37 Location: 27427 CALABRIA CT Start: Thu 8/19/2021 10:30 AM End: Thu 8/19/2021 11:00 AM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: CARLOS Co. Name: IP MECHANICAL Phone#: 951-603-6341 Cell#: vQiossst : SALERNO HYDRANT SYSTEM PASS FAIL IRE ALARM PASS FAIL Thrust block pre -pour I RoughAire inspection Underground rough Furrcfion test Under round hydro 4d detectors/velocity Flush 0 4 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Z Door fan test Underground hydro Z Abort test Flush lWecWnical shutdown Final " ctor test FIRE SPRINKLER SA YipMuge/pre-action Weld inspection /Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect 4F Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Seconds piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 5 Steven Fox Subject: FIRE21-0653 TR29835 O/H ROUGH/HYDRO LOT 37 Location: 27427 CALABRIA CT Start: Wed 6/2/2021 2:30 PM End: Wed 6/2/2021 3:00 PM Recurrence: (none) Organizer: Steven Fox Call Handling Mode 2: 2 Rep. Name: DANIEL Phone#: 951-703-5210 Cell#: Co. Name: NP MECHANICAL Urussot: JHLCKIVV HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: I Finish Time: 25