Loading...
27415 CALABRIA CT FIRE21-0654 SALERNO(liana Gutierrez Subject: FIRE21-0654 TR29835 SPK FINAL LOT 38 Location: 27415 CALABRIA CT Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: CARLOS Phone#: 951-603-6341 Thu 8/19/2021 10:30 AM Thu 8/19/2021 11:00 AM (none) Menifee OFM 2 Cell#: Co. Name: NP MECHANICAL CrossSt: SALERNO HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block re -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 124 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro 7w, Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile stora a Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system .. Spray booths Function Test Hood/duct extinguishing Gas/Electrical;shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarratonnection Tract access/hydrant verification Final :: Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 1 Steven Fox Subject: FIRE21-0654 TR29835 O/H ROUGH/HYDRO LOT 38 Location: 27415 CALABRIA CT Start: Wed 6/2/2021 2:30 PM End: Wed 6/2/2021 3:00 PM Recurrence: (none) Organizer: Steven Fox Call Handling Mode 2: 2 Rep. Name: DANIEL Phone#: 951-703-5210 Cell#: Co. Name: NP MECHANICAL %AU550L. JHLCKINU HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping th- UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary pipin Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: I Finish Time: 23