27403 CALABRIA CT FIRE21-0656 SALERNO(liana Gutierrez
Subject: FIRE21-0656 TR29835 SPK FINAL LOT 39
Location: 27403 CALABRIA CT
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: CARLOS
Phone#: 951-603-6341
Thu 8/19/2021 10:30 AM
Thu 8/19/2021 11:00 AM
(none)
Menifee OFM
2
Co. Nam/CrossSt:
NP MECHANICAL
Cell#: SALERNO
JF
HYDRANT SYSTEM
PASS
FAIL
OL FIRE ALARM
PASS
FAIL
Thrust block re- our
I Vugh-wire inspection
Underground rough
Prunction test
Under round hydro
<'
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Under round rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
F.
tector test
FIRE SPRINKLER
elu e/ re -action
Weld inspection
JF
Final
Overhead rough piping
110
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/inspect. Test
Emergency shut off
High pile storage
Primary piping
In -racks rinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
FFinal
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle modellplacemeKt
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
i
Steven Fox
Subject:
FIRE21-0656 TR29835 O/H ROUGH/HYDRO LOT 39
Location:
27403 CALABRIA CT
Start:
Wed 6/2/2021 3:00 PM
End:
Wed 6/2/2021 3:30 PM
Recurrence:
(none)
Organizer:
Steven Fox
Call Handling Mode 2:
2
Rep. Name: DANIEL
Phone#: 951-703-5210
Cell#:
Co. Name:
NP MECHANICAL
U1UJ,JL. QMLCrVVU
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/oadlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
27