Loading...
27374 TARANTO CT FIRE20-1423 SALERNO(liana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: DANIEL Phone#: 951-703-5210 FIRE20-1423 TR29835 SPK FINAL LOT 52 27374 TARANTO CT Wed 3/24/2021 8:00 AM Wed 3/24/2021 8:30 AM (none) Menifee OFM 2 Co. Name: NP MECHANICAL Cell#: CrossSt: SALERNO HYDRANT SYSTEM PASS FAIL Z FIRE ALARM PASS FAIL Thrust block pre -pour ou h-wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER 10 Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect Test Emergency shut off High pile storage Primary piping Secondary piping In-racksprinklers Hose racks 7 Dispensers & shear valves X Final Final KITCHEN HOOD E INGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical s t-off High pile rack storage Nozzle model/ acement H.P. vents/access/corridors Fire alarm cq6nection Tract access/hydrant verification Final Other: ,01SPRAY BOOTHS KNOX SYSTEM Installalkn Building Knox box Air flotv test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 3 Iliana Gutierrez Subject: FIRE20-1423 TR29835 O/H ROUGH/HYDRO LOT 52 Location: 27374 TARANTO CT Start: Tue 1/26/2021 10:00 AM End: Tue 1/26/2021 10:30 AM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: DANIEL Phone#: 951-703-5210 Cell#: Co. Name: NP MECHANICAL CrossSt: SALERNO HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block re -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping Ix UST/AST TANK X Overhead hvdro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 15