Loading...
27369 TARANTO CT FIRE20-0608 SALERNO(liana Gutierrez Subject: ZOOM FIRE20-0608 TR29835 SPK FINAL LOT 51 Location: 27369 TARANTO CT Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-858-7939 Tue 9/29/2020 2:00 PM Tue 9/29/2020 2:30 PM (none) Menifee OFM 2 Cell#: Co. Name: NP MECHANICAL CrossSt: SALERNO HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/veloc' Flush 24 hr. battery tes Final Sprinkler mojjiffring SPRINKLER U.G. Final Thrust block pre -pour PPECIAL SUPPRESSION Underground rough D fan test Underground hydro 0 ort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough pi in UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Prima piping In -rack sprinklers Secondaa piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical s -off High pile rack storage Nozzle model acement H.P. vents/access/corridors Fire alarm c6Wnection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final r—TFinal Final for occupancy Start Time: I I Finish Time: 15 Steven Fox Subject: FIRE20-0608 TR29835-1 O/H ROUGH/HYDRO LOT 51 Location: 27369 TARANTO COURT Start: Thu 7/2/2020 12:30 PM End: Thu 7/2/2020 1:00 PM Recurrence: (none) Organizer: Steven Fox Rep. Name: DANIEL Co. Name Phone#: 951-703-5210 Cell#: NP MECHANICAL CrossSt: SALERNO HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: