28960 STIRRUP CIRCLE FIRE21-0213 TRAILHEAD(liana Gutierrez
Subject:
FIRE21-0213 TR31098 SPK FINAL LOT 105
Location:
28960 STIRRUP CIRCLE
Start:
Mon 5/24/2021 8:00 AM
End:
Mon 5/24/2021 8:30 AM
Recurrence:
(none)
Organizer:
Steven Fox
Call Handling Mode 2:
2
Rep. Name: HECTOR
Co. Name: FSS
Phone#: 951-847-2908
Cell#: CrossSt: TRAILHEAD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
/Duct detectors/velocity
Flush
/
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
/
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Under round rough
Door fan test
Underground hydro
Abort test
Flush
i
Mechanical shutdown
Final
%
Detector test
FIRE SPRINKLER
%
Delu e/ re -action
Weld inspection
4/
Final
Overhead rough piping ,
'•,
UST/AST TANK
Overhead hydro
`
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Seconda i in
Hose racks
Dispensers & shear valves
X
Final %
Final
KITCHEN HOOD Q(TINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test '
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Buildina Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extin wishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
3
Steven Fox
Subject:
FIRE21-0213 TR31098 O/H ROUGH/HYDRO LOT 105
Location:
28960 STIRRUP CIRCLE
Start:
Fri 3/5/2021 9:00 AM
End:
Fri 3/5/2021 9:30 AM
Recurrence:
(none)
Organizer:
Steven Fox
Call Handling Mode 2:
2
Rep. Name: HECTOR
Phone#: 951-847-2908
Cell#:
Co. Name: FSS
ICI VJJJI. I rv1%1L-"C/1%LJ
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Under round rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extin uishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
3