Loading...
28936 STIRRUP CIRCLE FIRE21-0215 TRAILHEADSteven Fox Subject: FIRE21-0215 TR31098 SPK FINAL LOT 102 Location: 28936 STIRRUP CIRCLE Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 Fri 5/21/2021 8:30 AM Fri 5/21/2021 9:00 AM (none) Menifee OFM 2 Cell#: Co. Name: FSS CrossSt: TRAILHEAD HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. batte test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Under round hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Delu e/ re -action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile stora a Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final X Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupant Start Time: Finish Time: Start Time: Finish Time: 7 Iliana Gutierrez Subject: FIRE21-0215 TR31098 O/H ROUGH/HYDRO LOT 102 Location: 28936 STIRRUP CIRCLE Start: Wed 3/3/2021 12:00 PM End: Wed 3/3/2021 12:30 PM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: HECTOR Phone#: 951-847-2908 Cell#: Co. Name: FSS %.[0000L. I rvylLn C/'1LJ HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping °•;' UST/AST TANK X Overhead hydro ,../ Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 33