27060 GREAT PLAINS CT FIRE20-1336 TRAILHEAD(liana Gutierrez
Subject:
FIRE20-1336 TR31098 SPK FINAL LOT 12
Location:
27060 GREAT PLAINS CT
Start:
Mon 3/29/2021 11:00 AM
End:
Mon 3/29/2021 11:30 AM
Recurrence:
(none)
Organizer:
Menifee OFM
Call Handling Mode 2:
2
Rep. Name: HECTOR
Co. Name: FSS
Phone#: 951-847-2908
Cell#: CrossSt: TRAILHEAD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire ins ectOn
Underground rough
Function test
Underground hydro
Duct detect /velocit
Flush
24 hr. b test
Final
Sprin r monitorin
SPRINKLER U.G.
Fi
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Z
I Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
a
Final
KITCHEN HOOD EXTI UISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical sh off
High pile rack storage
Nozzle model! cement
H.P. vents/access/corridors
Fire alarm conl5ection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
27
Steven Fox
Subject: FIRE20-1336 TR31098 O/H ROUGH/HYDRO LOT 12
Location: 27060 GREAT PLAINS CT
Start: Wed 12/30/2020 12:30 PM
End: Wed 12/30/2020 1:00 PM
Recurrence: (none)
Organizer: Steven Fox
Call Handling Mode 2: 2
Rep. Name: HECTOR
Phone#: 951-847-2908
Cell#:
Co. Name: FSS
%,[USJJL. 1 MMILrlCPâ–şU
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X Overhead rough piping
(NI
UST/AST TANK
X Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
31