30476 CAREY RD FIRE21-0038 CAMDEN PLACEIliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JEFF
Phone#: 702-355-3238
FIRE21-0038 TR37067 SPK FINAL LOT 74
30476 CAREY RD
Mon 5/24/2021 1:30 PM
Mon 5/24/2021 2:00 PM
(none)
Menifee OFM
2
Cell#:
Co. Name: ON GUARD
%aIUJJJI. %at%1V1vr=1'4 r"LM%aF-
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire ins ectio
Underground rough
Function test
Underground hydro
Duct detectors/ydfocit
Flush
24 hr. batteryltest
Final
Sprinkler,44,fFonitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
,Poor fan test
Underground hydro
Abort test
Flush
9
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
1
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
\ \
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dis ensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle modellplacement
H.P. vents/access/corridors
Fire alarm. connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
I Finish Time:
29
(liana Gutierrez
Subject: FIRE21-0038 TR37067 O/H ROUGH/HYDRO LOT 74
Location: 30476 CAREY RD
Start: Mon 2/22/2021 1:30 PM
End: Mon 2/22/2021 2:00 PM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: ALFREDO
Phone#: 951-206-5781
Cell#:
Co. Name: ON GUARD
U[UbbOL. I.NIV UMN rLFiI..G
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emer ency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
29