Loading...
27344 BARRE DR FIRE21-0182 CAMDEN PLACE(liana Gutierrez Subject: FIRE21-0182 TR37067 SPK FINAL LOT 92 Location: 27344 BARRE DR Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JEFF Phone#: 702-355-3238 Tue 6/15/2021 8:30 AM Tue 6/15/2021 9:00 AM (none) Menifee OFM 2 Cell#: Co. Name: ON GUARD CrossSt: CAMDEN PLACE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection ,- Underground rough Function test 1000, Under round hydro Duct detectorsLvebcit Flush 24 hr. batte est Final SprinklVffionitoring SPRINKLER U.G. Fin Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/inspect. Test ArEmergency Ernwgency shut off High pile storage I Primary piping In-racksprinklers Seconds piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOODTINGUISHING MISC. INSPECTION Detection s ste Spray booths Function TesV Hood/duct extinguishing Gas/Electri shut-off High pile rack storage Nozzle del! lacement H.P. vents/access/corridors Fire alafm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupanc Start Time: Finish Time: Start Time: Finish Time: 9 (liana Gutierrez Subject: FIRE21-0182 TR37067 O/H ROUGH/HYDRO LOT 92 Location: 27344 BARRE DR Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: ALFREDO Phone#: 951-206-5781 Mon 3/22/2021 10:30 AM Mon 3/22/2021 11:00 AM (none) Menifee OFM 2 Cell#: Co. Name ON GUARD L;roSSSt: UAMULN F'LAUL HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground h dro Duct detectors/velocity Flush 24 hr. batte test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection / Final X Overhead rough piping % UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time- Finish Time: 13