Loading...
27333 BARRE DR FIRE21-0178 CAMDEN PLACEIliana Gutierrez Subject: FIRE21-0178 TR37067 SPK FINAL LOT 90 Location: 27333 BARRE DR Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JEFF Phone#: 702-355-3238 Tue 6/15/2021 8:00 AM Tue 6/15/2021 8:30 AM (none) Menifee OFM 2 Cell#: Co. Name ON GUARD CrossSt: CAMDEN PLACE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour I Rough -Wee inspection Underground rough I Func' n test Under round hydro D detectors/velocit Flush 4 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Under round hydro 7 Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect VC Removal Main drainlins ect. Test Emergency shut off High pile stora a Primary piping In-racksprinklers Seconds piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD E INGUISHING MISC. INSPECTION Detections stern Spray booths Function Test Hood/duct extinguishing Gas/Electrical ut-off High pile rack storage Nozzle modeVolacernent H.P. vents/access/corridors Fire alarm Onnection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 5 Iliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: ALFREDO Phone#: 951-206-5781 FIRE21-0178 TR37067 O/H ROUGH/HYDRO LOT 90 27333 BARRE DR Mon 3/22/2021 10:00 AM Mon 3/22/2021 10:30 AM (none) Menifee OFM 2 Cell#: Co. Name: ON GUARD CrossSt: CAMDEN PLACE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. batte test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping , ` UST/AST TANK X Overhead hydro Installation UG flush / OK to connect \ Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 11