Loading...
27320 BARRE DR FIRE21-0183 CAMDEN PLACE(liana Gutierrez Subject: FIRE21-0183 TR37067 SPK FINAL LOT 94 Location: 27320 BARRE DR Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JEFF Phone#: 702-355-3238 Tue 6/15/2021 8:30 AM Tue 6/15/2021 9:00 AM (none) Menifee OFM 2 Cell#: Co. Name: ON GUARD CrossSt: CAMDEN PLACE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rou h FunctionAt Underground hydro Duct d6iectors/velocit Flush 24,Kr, battery test Final prinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection A Final Overhead rough pipin UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage 0Z XPrimary piping In -racks rinkiers '' Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN. 00D EXTINGUISHING MISC. INSPECTION Qafectio stem Spray booths Func4 Test Hood/duct extinguishing Gas Iectrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: 1 1 Finish Time: 7 Iliana Gutierrez Subject: FIRE21-0183 TR37067 O/H ROUGH/HYDRO LOT 94 Location: 27320 BARRE DR Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: ALFREDO Phone#: 951-206-5781 Mon 3/22/2021 11:00 AM Mon 3/22/2021 11:30 AM (none) Menifee OFM 2 Cell#: Co. Name: ON GUARD CrossSt: CAMDEN PLACE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. batte test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro ; Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 17