27284 BARRE DR FIRE21-0533 CAMDEN PLACESteven Fox
Subject: FIRE21-0533 TR37067 SPK FINAL LOT 97
Location: 27284 BARRE DR
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JEFF
Phone#: 702-355-3238
Fri 7/2/2021 2:00 PM
Fri 7/2/2021 2:30 PM
(none)
Steven Fox
011
Cell#:
Co. Name
ON GUARD
UrU550l: UMMUCIV r'LAUM
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary-pipin
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
29
(liana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: ALFREDO
Phone#: 951-206-5781
FIRE21-0533 TR37067 O/H ROUGH/HYDRO LOT 97
27284 BARRE DR
Fri 4/23/2021 12:30 PM
Fri 4/23/2021 1:00 PM
(none)
Menifee OFM
2
Cell#:
Co. Name: ON GUARD
CrossSt: CAMDEN PLACE
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block re- our
Rou h-wire inspection
Underground rou h
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. batte test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
\
Removal
Main drain/Inspect. Test
Emergency shut off
High eile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/h drant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing s stem
T/I final
Fire alarm connection
Shell final
Final
Final for occupant
Start Time:
Finish Time:
Start Time:
Finish Time:
25