30909 PRIMROSE DR FIRE21-0404 PARK RIDGEIliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
FIRE21-0404 TR36303 SPK FINAL LOT 151
30909 PRIMROSE DR
Mon 6/28/2021 1:00 PM
Mon 6/28/2021 1:30 PM
(none)
Menifee OFM
2
Cell#:
Co. Name:
FSS
%-olUbbOL. rr►rvx MILAOM
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough-yvTre inspection
Underground rough
Fun(,tf6n test
Underground hydro
Dolt detectors/velocity
Flush
A24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
F
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
Removal
UG flush / OK to connect
Main drain/Inspect. Test
X
Emergency shut off
High pile storage K
►
Primary piping
In -rack sprinklers
Seconds piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTA GUISHING
MISC. INSPECTION
Detection system
Sprav booths
Function Test
Hood/duct extinguishing
Gas/Electrical shy( -off
High pile rack storage
Nozzle model/p acement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
31
Steven Fox
Subject: FIRE21-0404 TR36303 O/H ROUGH/HYDRO LOT 151
Location: 30909 PRIMROSE DRIVE
Start:
End_
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
Wed 4/14/2021 11:00 AM
Wed 4/14/2021 11:30 AM
(none)
Steven Fox
2
Cell#:
Co. Name: FSS
UF055Ji: h'HKr\ I iuUt
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
K
Installation
UG flush / OK to connect
Removal
Main drain/inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondwy piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hvdrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
t Finish Time:
11