Loading...
30901 PRIMROSE DR FIRE21-0409 PARK RIDGEIliana Gutierrez Subject: FIRE21-0409 TR36303 SPK FINAL LOT 152 Location: 30901 PRIMROSE DR Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 Mon 6/28/2021 1:30 PM Mon 6/28/2021 2:00 PM (none) Menifee OFM 2 Cell#: Co. Name FSS �..rv55��: rrlrcr� ruu�t HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function tq6t Underground hydro Duct det6ctors/velocity Flush 24 hT.,battery test Final Sprinkler monitoring SPRINKLER U.G. Anal Thrust block pre -pour SPECIAL SUPPRESSION Underground rough y Door fan test Underground hydro // Abort test Flush Mechanical shutdown Final / Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro i Installation UG flush / OK to connect , ` Removal Main drain/Inspect. Test Emergency shut off Hi h pile storage Primary piping In -rack sprinklers Secondary pipin Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off,• High pile rack storage Nozzle model/place 'ent H.P. vents/access/corridors Fire alarm canna.ofion Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 35 Steven Fox Subject: FIRE21-0409 TR36303 O/H ROUGH/HYDRO LOT 152 Location: 30901 PRIMROSE DRIVE Start: Wed 4/14/2021 11:30 AM End: Wed 4/14/2021 12:00 PM Recurrence: (none) Organizer: Steven Fox Call Handling Mode 2: 2 Rep. Name: HECTOR Phone#: 951-847-2908 Cell#: Co. Name: FSS UFU550l: r t-%Mr\ rVUl7C HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping io UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 13